01What it is
The report covers jobs created in the chosen date range, except cancelled ones. A job's revenue is the actual price, or if there is none, the planned price or the total of its items. Each job shows where its amount comes from.
Cost is materials, labour and rework. Labour comes from working time entries, or without them from the plan or labour items. A job with no time entries is marked as incomplete data.
Margin is revenue minus cost, and the margin percentage is margin divided by revenue.
- THE REAL COST
- Materials, working time and rework.
- PLAN VERSUS REALITY
- Planned and actual time on every job.
- BREAKDOWN
- Margin by customer, make, category and location.
02What it is for
Which jobs pay
Margin and margin percentage on every job.
Better quotes
Plan versus actual time is the basis for correcting future quotes.
Which makes earn
Margin broken down by vehicle make and type.
Rework cost
Comebacks show in the cost of every job.
03Main options
The report has tiles with forecast revenue and margin, and three tabs: Result, Jobs and Breakdown.
Profit versus spend
A picture of the whole period.
- Revenue, cost and margin over time
- What the revenue is made of: parts and materials, labour, margin
- Services by turnover

Plan versus reality
Every job with its result.
- Revenue with its source: actual, planned or from items
- Planned and actual time, real cost, result and margin %
- Comeback cost

Margin by dimension
You pick a dimension, and the table adds up to the whole.
- Dimensions: category, group, location, job type, vehicle type and make, customer
- Hours, parts and labour cost, rework, margin and margin per hour
- Rows without a value under Unassigned

04Tasks step by step
- STEP 1Open Modules › Reports › Jobs and profitability, Jobs tab.
- STEP 2Set the date range and sort by margin.
- STEP 3Click a job to check its items and working time.
- STEP 1Open the Breakdown tab.
- STEP 2In Dimension pick the vehicle make.
- STEP 1Jobs marked as incomplete data have no working hours entered.
- STEP 2Enter the hours in Modules › Workshop › Job hours, so labour cost is actual.
05Actions
The most common tasks in the profitability report.
Date range
Compared with the previous period.
Dimension
Margin by the chosen dimension.
Export CSV
Jobs, services and the margin breakdown.
06What it connects to
Choose a module to see where the amounts come from.
Complaints and comebacks
Rework cost comes from comebacks.
Go to the topicComplaints and comebacksOwner centre
The most loss-making jobs are also in the Owner centre.
Go to the topicOwner centre