Skip to content
MIVARE LABS WORKS CAR REPAIR GARAGE MANAGEMENT SYSTEM
03 / STOCK AND PARTS · Mivare Works
03 / STOCK AND PARTS

Before you promise a date, check the parts you need.

See your stock levels, reserve parts for the repair and prepare an order for your supplier. Planning the work is easier when you know what is missing.

WHY IT MATTERS

Parts decide the date and the margin of the job.

Before you confirm a date, check whether the part is available and reserve it for that specific repair. Recorded usage will help you bill the job later.

STOCKRESERVATIONORDER

01 / AVAILABILITY

Stock visible without checking the shelves

A date promised to the customer without knowing the stock levels often has to be moved later.

The system shows physical stock, availability after reservations and deliveries on the way.
02 / RESERVATIONS

A part set aside for a specific car

A part prepared for one job is sometimes used on another, and the shortage only comes to light at fitting.

A reservation assigns the part to the job and reduces the available stock.
03 / COST

Purchase price in the job billing

Without the purchase price, the margin on parts is an estimate, and consumables are often not taken into account at all.

Purchase and sale prices are kept separately, and usage goes onto the job.
SYSTEM FEATURES

Stock managed together with jobs.

Link parts, materials and tools to the job. Once you record usage, you will also find it in the repair costs.

STOCK LEVELSORDERSRESERVATIONSCOST

01 / STOCK LEVELS

Items, stock value and minimum levels.

The parts catalogue covers physical stock, availability after reservations, the location in the stockroom and the purchase and sale price. Items below the minimum level are highlighted, and the stock value is calculated at cost.

  • You check parts availability before confirming a date.
  • You know how much capital is tied up in stock.
Stock levels: number of items, items below the minimum and stock value at cost
02 / ORDERS TO SUPPLIERS

A requirement from the job, an order with the supplier.

You add a missing part as a requirement directly on the job. Orders to suppliers have a status, a delivery date and a value, and the supplier's history shows prices and delivery punctuality.

  • The value of orders on the way is always visible.
  • You choose suppliers based on prices and punctuality.
Parts orders: all, needed, ordered or on the way, and the value in progress
03 / RESERVATIONS FOR JOBS

Parts assigned to specific jobs.

A reservation sets a part aside for the chosen job and reduces the available stock. The reservations register shows items reserved, issued and those not covered by stock.

  • A part prepared for one car does not end up on another job.
  • Shortages are visible before the car goes into the bay.
Parts reservations: all, reserved, not covered and issued
TRIAL PERIOD

Enter the parts you use most often and try the stock module in practice.

Start with the parts and materials you use most often. On the job you record their usage and check the available stock.

You can add the other items on later jobs.

Try it free for 30 days
  • Do I need to install anything? No. The system runs in the browser.
  • Is the number of parts limited? No. The stock module works in full.
  • Can I import a supplier's price list? Yes. The system can import supplier price lists.